setup & testing
The completed switch is setup on a flip lid gear box and cycled from the fully extended position to the fully retracted position twenty five times. The switch mounted to the gear box is bench tested for continuity throughout its movement. Initial full extension and full retraction preset adjustments are made at this point. After initial "pre-set" The switch is cycled throughout its rotation while all wiring connectors are monitored and checked for proper continuity in the full extended and retracted positions to insure proper function. After successful completion the switch is removed from the gearbox and all fasteners tightened to specification.
|